anqer.radar
Medium-voltage Switchgear with rated voltage level (Ur) 36 kV - Open Qualification System 2026
Description
50Hertz Transmission GmbH establishes an open qualification system (OQS) for medium-voltage switchgear with a rated voltage (Ur) of 36 kV (single busbar) for its substations in Germany. The purpose of the OQS is to qualify and maintain a broad pool of suitable suppliers, on which subsequent procurement procedures (e.g. framework agreements) will be based. The system is open to new applicants throughout its duration: Starting in 2026, it is currently open ended. Applicants who successfully qualify and are awarded in a subsequent tender must deliver on the following scope: Development, supply, factory testing, delivery, unloading, installation, assembly, and on-site testing of the MV switchgear offered. Qualification is offered for two categories: 1) switchgear with a GWP < 1 or insulation gases free of fluorinated greenhouse gases according to EU regulation 2024/573, and 2) switchgear with insulation gases with a GWP ≥ 1000.
- Contracting authority
- 50Hertz Transmission GmbH
- Authority's seat
- Berlin · Berlin
- Place of performance
- Berlin
- Submission deadline
- —
- Published
- 28 October 2026
- Estimated value
- —
- Procedure
- —
- Portal
- ÖffentlicheVergabe.de (DÖE) · oeffentlichevergabe.de
CPV codes
Contract notice
The original notice on the contracting authority's portal.
Sourcehttps://oeffentlichevergabe.de/ui/de/search/details?noticeId=604c93c7-2bc6-46b2-893f-46780fa26248&lotId=LOT-0000No documents are linked for this tender.
About the contracting authority
50Hertz Transmission GmbH currently has 8 open tenders.
More open tenders from 50Hertz Transmission GmbH
- 380-kV-Netzverstärkung Region Rostock (P215) Abschnitt: Bentwisch - Güstrow
- Facility Management - Regionalzentren
- Data Consulting and Services for GrAS (524-2026-EU3)
- Elektrotechnische Leistungen in 220-/380-kV-Umspannwerken / Electrotechnical Works in 220-/380-kV Substations
- Ersatzneubau Umspannwerk UW Reuter
Similar tenders
- Flughafen Tegel 2_Versorgen - Strom_ Notstromaggregat SprinkleranlageLand Berlin, vertreten durch das Landesamt für Flüchtlingsangelegenheiten und Unterbringung (LFU) vertreten durch die BIM Berliner Immobilienmanagement GmbH Berlin Deadline: 15 Dec 2026 in 29 days
- Prüfungssystem für luftisolierte 10-kV-Schaltanlagen in 110/10-kV-UmspannwerkenStromnetz Berlin GmbH Berlin
- Rahmenvereinbarung Lieferung von LeuchtmittelnHumboldt-Universität zu Berlin Berlin Deadline: 30 Nov 2026 in 14 days
- DimmeranlageKulturveranstaltungen des Bundes in Berlin GmbH (KBB GmbH) Deadline: 1 Dec 2026 in 15 days
- Lieferung von Trafo- und Knotendifferentialschutzgeräten inklusive Reparatur- und ServiceleistungenStromnetz Berlin GmbH Berlin
- Wartung und Instandhaltung der Gefahrenmeldeanlagen in div. Liegenschaften im Bezirk Marzahn-H.Bezirksamt Marzahn-Hellersdorf von Berlin Berlin Deadline: 11 Dec 2026 in 25 days
- Regenerative Energien bei Land- und Baumaschinen hier: Hochvolt-LehrsystemverbundRhein-Erft-Kreis Nordrhein-Westfalen · Bergheim Deadline: 15 Dec 2026 in 29 days
- Schlüsselfertige Errichtung (EPC) eines netzgekoppelten BatteriespeichersystemsEnergiespeicher Soltau I GmbH Niedersachsen · Soltau Deadline: 14 Dec 2026 in 28 days