anqer.radar
Environmental survey and Environmental Impact Assessment (EIA) for Shore Crossing - AquaDuctus Section 1 (Offshore)
Description
To address Europe's future energy demand, significant investments into hydrogen infrastructure are essential. One of the core components of this initiative is the development of a pan-European hydrogen pipeline network in the North Sea, designed to connect major hydrogen producers with key consumers across the continent. The AquaDuctus project is part of this future pipeline network. The AquaDuctus project consists of an offshore part (Exclusive Economic Zone (EEZ) and territorial waters of the German North Sea and a receiving terminal at the coastline of Lower Saxony) and an onshore part to make connection with the onshore grid. The AquaDuctus project is planned as a large diameter pipeline (48 inch) with a transport capacity of 20 GWH2 and a design pressure of 120 bar. The conceptual design of the pipeline enables the connection of neighbouring European hydrogen infrastructures and the planned production facilities in the German EEZ (SEN-1 Area). For the shore crossing, the selected contractor shall prepare a legally compliant EIA as part of the Energy Industry Act (EnWG) permit process, based on agreed scoping with the responsible approval authority (Landesamt für Bergbau, Energie und Geologie - LBEG), covering nature conservation, water protection, and impact compensation requirements, which also include environmental studies. The substantive requirements for the environmental documentation are derived from the Energiewirtschaftsgesetz (EnWG), Bundesnaturschutzgesetz (BNatSchG) and Wasserhaushaltsgesetz (WHG). The contracting authority will align the precise scope of the investigations with the LBEG. The selected contractor shall assist the contracting authority in preparing, planning and executing the permit application process. The services comprise: determination of the data basis; preparation of documents for and participation in the scoping conference with the approval authority and specialist authorities (optional); performance of environmental surveys; preparation of formal environmental documentation for approval. Further technical requirements are detailed in Attachment B.1 Scope of Work. The duration of the contract is not time limited. The estimated duration is 2.5 years, but the works due under the contract may take longer, e.g., if the works are not yet completed because the permit application process takes longer. Further details are provided in the contract documentation.
- Contracting authority
- AquaDuctus Pipeline GmbH
- Authority's seat
- Hessen · Kassel
- Place of performance
- —
- Submission deadline
- —
- Published
- 22 August 2026
- Estimated value
- —
- Procedure
- —
- Portal
- ÖffentlicheVergabe.de (DÖE) · dtvp.de
CPV codes
Contract notice
The original notice on the contracting authority's portal.
Sourcehttps://oeffentlichevergabe.de/ui/de/search/details?noticeId=f1b7f03a-97a4-49b6-90e8-c22b0f934a2e&lotId=LOT-0001Tender documents
This tender's documents on the contracting authority's portal.
About the contracting authority
AquaDuctus Pipeline GmbH currently has 3 open tenders.
More open tenders from AquaDuctus Pipeline GmbH
All tenders from AquaDuctus Pipeline GmbHSimilar tenders
- A 44, AS Zierenberg bis AK Kassel/West, km 9,500 bis 5,500, RiFa Kassel - Entsorgung teerpechhaltiger StraßenaufbruchDie Autobahn GmbH des Bundes - NL Nordwest Niedersachsen · Hannover Deadline: 14 Dec 2026 in 28 days
- Grundjahresreinigung und Notdienst Kanal 2027Magistrat der Stadt Rodgau Hessen · Rodgau Deadline: 15 Dec 2026 in 29 days
- Abfallentsorgung für alle Standorte der Lahn-Dill-KLliniken GmbHLahn-Dill-Kliniken GmbH Hessen · Wetzlar Deadline: 18 Dec 2026 in 32 days
- Grün- und Außenanlagenpflege für 3 Liegenschaften in WI - aufgeteilt in 2 LoseLand Hessen, vertreten durch das Hessische Competence Center -Beschaffungen- Hessen · Wiesbaden Deadline: 15 Dec 2026 in 29 days
- UHR Max-Beckmann-SchuleStadt Frankfurt am Main, Amt für Bau und Immobilien Hessen · Frankfurt am Main Deadline: 22 Dec 2026 in 36 days
- UR, SR Hessisches Statistisches Landesamt in Wiesbaden - 2 Lose -Land Hessen, vertreten durch das Hessische Competence Center -Beschaffungen- Hessen · Wiesbaden Deadline: 16 Dec 2026 in 30 days
- Aktivkohlewechsel in der Grundwasseraufbereitungsanlage im Geb.896Fraport AG Hessen
- ZMW26-Reinigung Geschäftsstelle 2027/2028 (optional 2028/2029)Zweckverband Mittelhessische Wasserwerke (ZMW) Deadline: 10 Dec 2026 in 24 days