anqer.radar
Inspection of the natural gas transmission system Zhidilovo–Skopje and distribution pipeline Skopje South using the in-line method, and inspection of Deve Bair–Zhidilovo (0–4 km) and distribution pipelines Skopje North 1.8 km, Bunardzhik 5.4 km, Kumanovo 7.7 km, Kratovo 4.6 km and Kriva Palanka 1.5 km using NDT methods
Beschreibung
Services for inspection of the natural gas transmission system Zhidilovo–Skopje and the distribution pipeline Skopje South using in-line inspection (ILI), as well as inspection of the Deve Bair–Zhidilovo section (0–4 km) and the distribution pipelines Skopje North (1.8 km), Bunardzhik (5.4 km), Kumanovo (7.7 km), Kratovo (4.6 km) and Kriva Palanka (1.5 km) using non-destructive testing (NDT) methods, in accordance with the technical specification in the tender documentation.
- Auftraggeber
- Joint Stock Company for performing energy activity natural gas transmission NOMAGAS Skopje in state ownership
- Sitz des Auftraggebers
- MK008
- Erfüllungsort
- SKOPJE
- Abgabefrist
- 23. November 2026 in 7 Tagen
- Veröffentlicht
- 26. Oktober 2026
- Geschätzter Wert
- —
- Verfahren
- Offenes Verfahren
- Portal
- TED · e-nabavki.gov.mk
CPV-Codes
Bekanntmachung
Die Original-Bekanntmachung auf dem Portal des Auftraggebers.
Quellehttps://ted.europa.eu/de/notice/-/detail/738988-2026Vergabeunterlagen
Die Unterlagen dieser Ausschreibung auf dem Portal des Auftraggebers.
Über den Auftraggeber
Joint Stock Company for performing energy activity natural gas transmission NOMAGAS Skopje in state ownership hat derzeit 1 offene Ausschreibung.
Alle Ausschreibungen von Joint Stock Company for performing energy activity natural gas transmission NOMAGAS Skopje in state ownershipÄhnliche Ausschreibungen
- Auftraggeber-Vertretung (Drilling Supervision) für die GeoMmetEer Forschungsbohrung LWB-01 – Langenweißbach (Sachsen)Bundesgesellschaft für Endlagerung mbH (BGE) Niedersachsen · Peine Frist: 26.11.2026 in 10 Tagen
- Temporäre Aktivkohlestufe am Wasserwerk MeindorfWahnbachtalsperrenverband Frist: 20.11.2026 in 4 Tagen
- ILI HYRER/HYRELGASCADE Gastransport GmbH Hessen · Kassel
- IWB, Fernwärme Kernbohrungen HausanschlüsseIWB Industrielle Werke Basel Frist: 02.12.2026 in 16 Tagen
- Gręžinių su vandens tiekimo įranga remontas ir aptarnavimas (skelbiama apklausa)Pasienio kontrolės punktų direkcija prie Susisiekimo ministerijos Frist: 25.11.2026 in 9 Tagen
- SYNERGYS PROJECT: MUD LOGGINGUniverzita Karlova Frist: 08.12.2026 in 22 Tagen
- Curative maintenance of submarine HV cable links (Marine Operations)RTE Réseau de Transport d'Electricité
- Richtbohrtechnik, MWD und Bohrmeißel für die Forschungsbohrung GeoMetEr LWB-01 - Langenweißbach (Sachsen)Bundesgesellschaft für Endlagerung mbH (BGE) Niedersachsen Frist: 07.12.2026 in 21 Tagen